Skip to main content
To get to work a commuter must cross rain tracks. The time the rain arm es varies slightly from day to day butthe commuter estimates hell get stopped on about 14% o workdays. During a certain 5-day work week find the probabilities that the commuter gets stopped as described in parts a through d. a) On Monday and again on Tuesday b) For the first time on Thursday c) Every day d) At least once during the week

ANSWER ALL 4 QUESTIONS and DO NOT ROUND UP

ANSWER

Given,
14% = 0.14
5 day work week
a.
on monday and again on tuesday,
continuous 2 days, so multiply 2 times
0.14 * 0.14 = 0.0196
b.
for the first time on thursday
(100% - 14% = 86%, 86% = 0.86)
monday to wednesday and on thursday
0.86 * 0.86 * 0.86 * 0.14 = 0.089
c.
every day
5 work days, monday to friday, so,
multiply 5 times
(0.14)^5 = 0.00005378
d.
at least once during the week
1 - P(not stopped) = 1 - 0.86^5 = 1 - 0.4704270176 = 0.5295

Comments

  1. https://www.chegg.com/homework-help/questions-and-answers/problem-7-3-iaa-armenia-company-reported-following-informa-december-31-2017-ation-cash-han-q30757084

    ReplyDelete

Post a Comment

Popular posts from this blog

Osmosis Data Sheet

Data Sheet: Activity - Osmosis Name Course Date Activity Data Code       Procedure I -Test Solution 1: Water Complete the tablesand questions below using your data and information found under the Background tab Data Table I Note: Difference in Final Volumes = Final Volume of Test Sol - Final Volume of Water Trial Starting Volume of Test Solution (L) Starting Volume of Water (L) Final Volume of Test Solution (L) Final Volume of Water (L) Difference in Final Volumes (L) 1 1.28 1.75 1.51 1.52 -0.01 2 1.28 2.00 1.64 1.64 0 Observations and Questions [1] Given that the final heights (and volumes) are the same for the water and test solution, what can you...

Pseudocode - painting a wall

My pseudocode from Module Two: Pseudocode – Painting a Wall MEASURE wall-length MEASURE wall width CALCULATE wall area DETERMINE amount of paint needed for wall-size PURCHASE desired paint and tools (brushes, rollers, pan, etc.) PREPARE work area and tools START painting wall END when painting is complete CLEAN work area and tools STORE tools and any leftover pa​‌‌‌‌‌‌‍‍‍‌‌‍‍‍‌‍‌‍‍​int
Simple Computer Science Questions Question 2 ANSWER Match the following a - 4 b - 10 c - 8 d - 6 e - 9 f - 1 g - 2 h - 7 i - 3 j - 5